Trending...
- Heritage at South Brunswick Introduces New Ferndale Floorplan: The Largest Single-Family Home Design in the Community
- Columbia Police arrest suspect for shots fired on East Walnut Street
- Columbia Police arrest suspect in burglary of business on Seventh Street
(COLUMBIA, MO) ~ Columbia's Public Works Street division has announced that road work will be taking place on East Walnut Street starting at 7 a.m. on Thursday, November 6. The work will be focused on the section of the street east of Old U.S. 63 and is expected to continue until Friday, November 14.
According to the division, the road edge in several locations between Old U.S. 63 and Calvin Drive has deteriorated and needs to be replaced with concrete for stability. This area is currently marked with dotted lines and utility locate flags.
More on Missouriar
The crews will be working on this project for two separate periods, from November 6-7 and again from November 10-14. Despite Veterans Day falling within this time frame, work will still continue as it is an observed City holiday.
During the construction, lane closures will be necessary and flaggers will be present to guide traffic through the area safely. Drivers are advised to slow down and remain cautious while passing through the work zone.
If all goes according to plan, the project is expected to be completed by 5 p.m. on Friday, November 14, weather permitting. The City of Columbia urges drivers to plan their routes accordingly during this time period.
According to the division, the road edge in several locations between Old U.S. 63 and Calvin Drive has deteriorated and needs to be replaced with concrete for stability. This area is currently marked with dotted lines and utility locate flags.
More on Missouriar
- Columbia: Go COMO Blue Route to detour beginning Aug. 24 due to Clark Lane roundabout construction
- The Golden Jazz Fest Shuttle Returns for 2026
- Statement from mayor, City Council and city manager of Columbia on downtown public safety
- Columbia: Elevators temporarily out of service in Short Street, Plaza parking garages
- Columbia: Solid Waste Utility hosts second recycling drop-off event
The crews will be working on this project for two separate periods, from November 6-7 and again from November 10-14. Despite Veterans Day falling within this time frame, work will still continue as it is an observed City holiday.
During the construction, lane closures will be necessary and flaggers will be present to guide traffic through the area safely. Drivers are advised to slow down and remain cautious while passing through the work zone.
If all goes according to plan, the project is expected to be completed by 5 p.m. on Friday, November 14, weather permitting. The City of Columbia urges drivers to plan their routes accordingly during this time period.
0 Comments
Latest on Missouriar
- Merger Advancement For Embodied AI Co in Robotic Systems Serving High Value Hospitality, Gaming & Real Estate Sectors: MBody AI Corp. (NAS DAQ: MBAI)
- Hollywood In Pixels Announces Honorees for The 9th Silver PIXel Awards
- New Research Finds a Good Deal Is All It Takes to Get Americans Booking a Last-Minute Vacation — and Most Already Have One on Their Mind
- GitKraken Introduces GitLens 19, Bringing Human and AI Workflows Together in One Workbench
- LĪNA Universal Balm Nominated for "Best Clean Skincare Product" at CertClean Beauty Awards
- Bronze Stevie Award Recognizes Satyadhar Joshi for AI Research and Public Policy Engagement
- synseer Nominated for Best Startup in 2026 Prix Galien USA Awards Following Record Breaking Applicant Pool
- Columbia: Community members invited to participate in homelessness Strategic Plan process
- Leading PDR Training Courses in Canada: Learn Paintless Dent Repair with PDR Academy & Tint Academy
- Move in this Fall! New Released Quick Move-In Townhomes at Heritage at South Brunswick with Limited-Time Incentives
- Columbia: Pavement maintenance scheduled for South Sinclair Road, Aug. 17-20
- Columbia: SAVE-A-LIFE: Naloxone education and distribution event to be hosted at City Hall, August 18
- Crossroads4Hope Marks 25 Years Ensuring No One Faces Cancer Alone At its Inspiring Hope Gala
- "Our Lady of the Artilects" Comes to Audio with Kobna Holdbrook-Smith
- Columbia Police respond to homicide on Range Line Street
- Q1 2026 Arizona Technology Industry Impact Report Recaps Advanced Manufacturing Growth, High-Value Jobs and Workforce Investment
- Former Prosecutor Opens Stegall Law in Summerville
- Columbia: The 2026 Boone County Maternal Child Health Assessment is now available
- Vboost Celebrates 14 years of Automotive Viral Marketing
- Ignazio Arces Wins Stevie® Award for Maverick of the Year at the 2026 International Business Awards